About the Zao Wind Power Project(Issue)
Construction starts in 2028
Operation starts in 2031
Maximum number of wind turbines is 23
Output is 96,600kw
The operator is Kansai Electric Power Co.
The wind farm will be constructed on a small mountain ridge centered on Tateishi Mountain.

Aone Onsen hot spring and many other inn facilities,
as well as residents and businesses, are located within a 5-km radius.

The power generation facility is easily visible from Mt.

Is a huge man-made structure necessary in a place
where so much unspoiled and magnificent nature still remains?

What is the reason for destroying nature and transmitting power
to the Kansai region more than 1,000 km away?
We who live in the Tohoku region are blessed with abundant nature.

We in the Tohoku region, because of the abundance of nature,
always want to be grateful for nature and have a humble attitude toward it.